メインコンテンツまでスキップ
We are redesigning the NetApp Knowledge Base site to make it easier to use and navigate. The new and improved site will be available the first week of October. Check out our video or read this KB article to know more about changes you’ll see on the site.

ATTO ブリッジの FB7500N FC ポートが停止しています

Views:
15
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

に適用されます

  • MetroCluster
  • ATTO FB7500N

問題

ATTO ブリッジの FC ポートが停止していますが、次のエラーがあります。
 
01ECC3 09:59:22 03/09/20 INFO FC Async Event, Link Down, PTP/Fabric, 8Gb on FC Port 1
01ECC4 09:59:22 03/09/20 INFO FC Port 1 Link Down detected.
01ECC5 09:59:22 03/09/20 INFO FC Loop Is Not Operational on FC Port 1
01ECC6 09:59:22 03/09/20 INFO FC Port ID 0x0000EF [0x000] LogOut  Pt:1500A09820B2B5D80
01ECC7 09:59:22 03/09/20 INFO Initiator 500A09820B2B5D80 logged out.
01ECC8 09:59:54 03/09/20 WARN FC SFP speed capability less than adapter capability (8.0
01ECC9 09:59:54 03/09/20 WARN  gHz) on FC Port 1

 

CUSTOMER EXCLUSIVE CONTENT

Registered NetApp customers get unlimited access to our dynamic Knowledge Base.

New authoritative content is published and updated each day by our team of experts.

Current Customer or Partner?

Sign In for unlimited access

New to NetApp?

Learn more about our award-winning Support