メインコンテンツまでスキップ

「switchback -simulate」を実行したあと、ジョブを実行したままにします

Views:
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster<a>2009133446</a><a>for -翻訳</a>
Last Updated:

環境

MetroCluster システム

問題

  • MetroCluster スイッチバックシミュレートのジョブが in-progress ステータスで停止します
  • 以降のMetroCluster のジョブは、次の場合に失敗します。 Error: command failed: This MetroCluster operation cannot be run because another "switchback" operation is currently in progress. Run "metrocluster operation history show -job-id 4321 -instance" to view the status of the currently running operation.

Cluster_A::> metrocluster operation history show -job-id 4321 -instance
Operation: switchback-simulate
State: in-progress
Errors: -
Node: Cluster_A-01
Start Time: 4/9/2022 09:44:14
End Time: -
Job ID: 4321
Operation UUID: 9a1011ba-b5f9-11ea-c726-00a098e01597
Command Line: metrocluster switchback -simulate true
Additional Info: -

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.