MetroCluster IP:DRパートナーノードからの定期的なメッセージを検証できません
環境
- MetroCluster IP
- ONTAP 9
- 共有ISLインフラ
問題
スイッチバック処理を実行しようとすると、次のエラーが発生します
例:
ClusterA::*> metrocluster operation show Operation: switchback State: failed Start Time: 12/28/2022 15:13:18 End Time: 12/28/2022 15:13:53 Errors: Failed to validate the node and cluster components before the switchback operation. ClusterB::ClusterB-02 (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support. ClusterB::ClusterB-01 (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support.